Planning a Renovation: Survey, Brief, Design, Permits and Budget
Renovating is different from building new because you start with a building that already has opinions: walls that may carry loads, wiring and pipes of uncertain age, materials that may be hazardous, and decades of previous alterations, not all of them good. Most renovation surprises (and budget overruns) come from things nobody looked at before design began. A good plan puts investigation first and keeps the whole team working from the same information.
1. Measure and record what is there
Design starts with accurate drawings of the existing building. A measured survey records room dimensions, wall thicknesses, window and door positions, ceiling heights, floor levels and the roof, producing existing-condition plans, and often sections and elevations. Original drawings, if you can find them in your records or the building department's archive, are a useful start but should be checked on site, since buildings are rarely built exactly as drawn and later changes are often unrecorded.
2. Investigate existing conditions
Before committing to a design, find out what the building is made of and what condition it is in:
- Structure. Which walls, beams and posts carry loads, the condition of the foundation, floor and roof framing, and any signs of movement or rot. Never assume a wall is not load-bearing; a licensed structural engineer or architect should assess any wall, beam, column, joist, rafter, truss or foundation you want to remove or alter, and any added load such as a new story, a roof deck or heavy finishes.
- Moisture. Leaks, damp basements, poor drainage and condensation; fixing the cause comes before finishing the space.
- Services. The age and capacity of electrical, plumbing, heating and ventilation systems. A new kitchen or addition may need a larger electrical service or new equipment.
- Energy. Insulation, air leakage and windows, so improvements can be planned into the work while walls are open.
- Hazardous materials (see below).
3. Hazardous materials in older buildings
Lead. In the US, assume paint in a home built before 1978 may contain lead until it is tested. Renovation that disturbs it can create hazardous dust, which is especially dangerous for children and pregnant people, so keep them away from the work area. Contractors paid to disturb paint in pre-1978 homes must be EPA lead-safe certified firms under the Renovation, Repair and Painting Rule and must follow lead-safe work practices; homeowners doing their own work are urged to follow them too. Avoid dry sanding, power planing and open-flame burning of old paint. Check the current details on the EPA's RRP program page, and look for state rules that may be stricter.
Asbestos. Older insulation, vinyl flooring and its adhesive, textured ceilings, pipe and boiler lagging, roofing, siding and cement-board panels may contain asbestos. Material in good condition that will not be disturbed is often best left alone, but if renovation will disturb it, have it sampled by an accredited professional first, and have it removed by a licensed abatement contractor where required. Do not cut, sand, drill or break suspect material yourself.
Other countries have their own rules for lead, asbestos and other hazards; follow your national and local regulations.
4. Write the brief
List what you want the renovation to achieve and what matters most: more space, better flow between rooms, more light, accessibility, energy performance, a rental unit. Note what must stay (a fireplace, original windows, a fixed budget) and what you will give up if needed. A clear brief, agreed by everyone in the household, keeps design focused. Our guide to working with an architect covers briefs and the design phases in more detail.
5. Design, with the whole team early
Renovations go wrong when the designer, engineer, contractor and specialist trades each work in isolation and discover conflicts on site. Bringing them together early helps:
- Involve the structural engineer during design, not after the drawings are finished.
- On complex jobs, ask a contractor to review the design for buildability and cost before it is final.
- Name one person (often the architect or the general contractor) as the point of contact for questions and decisions.
- Hold regular site meetings during construction, and put every change in writing, with its cost and time effect agreed before the work is done.
6. Permits and approvals
Structural, electrical, plumbing, gas, mechanical, roofing, window and many other renovation jobs need a permit and inspections, and a change of use (such as making a basement or garage into living space) usually triggers a fuller review. Zoning, historic district and homeowner association approvals are separate. Check with the building department before work starts; unpermitted work can cause problems with insurance and when you sell. See building permits explained.
7. Budget and contingency
A renovation budget should include construction, design and engineering fees, surveys and testing, permit fees, any hazardous-material work, temporary accommodation or storage if you must move out, furnishings, and a contingency for what is found when walls and floors are opened. Older buildings generally justify a larger contingency than new ones. Get written quotes for the work itself.
Worked example, example figures only: new flooring over 500 square feet, with boxes that each cover 25 square feet and a 10 percent waste allowance, needs 500 x 1.10 = 550 square feet, or 550 / 25 = 22 boxes, which the material coverage calculator works out for you. If the quoted renovation comes to $80,000 and you hold back an example contingency of 15 percent ($12,000), plan on $92,000 before fees and furnishings. Use your own figures and quotes.
8. During construction
- Agree how dust will be contained and how utilities will be maintained if you are living in the house.
- Visit the site only with the contractor's knowledge, and wear the protective gear they require (typically a hard hat, safety boots and eye protection).
- If you use a ladder to check work, set it on firm, level ground at about 1 foot out for every 4 feet of height, extend it at least 3 feet above the landing, keep three points of contact, and never stand on the top steps (check OSHA's current ladder guidance). Leave roof work and work at height to professionals with fall protection.
- Confirm each required inspection is passed before work is covered up, and keep all approved drawings, permits and inspection records.
This article explains how renovation planning generally works and is not professional advice. Decisions for a specific building are made with a licensed architect or engineer and the local building department.