Working With an Architect: The Brief, Design Phases and Fees
An architect turns what you need into a building that works, can be permitted and can be built for a budget. For a homeowner, the process can feel opaque the first time: what you are paying for, what happens when, and what decisions you will be asked to make. The work is organized in a fairly standard sequence in the US and many other countries, and knowing it makes the relationship easier.
When to hire an architect
An architect is most valuable on a new house, an addition, a major renovation that changes layout or structure, a difficult site (steep, narrow, flood-prone or in a historic district), or any project where the design itself matters to you. Some projects legally require an architect's or engineer's seal on the drawings; which ones depends on your state or country and the building type (see when plans need an architect's stamp). For smaller, simpler jobs, some owners work with a residential designer or a design-build contractor instead, where local law allows.
Architects are licensed by each state. Before you sign, confirm the person or firm is licensed in the state where the project is located, using the state licensing board's online lookup.
Finding and choosing one
- Ask friends, neighbors and local builders whose work you like for names.
- Look at portfolios for projects of a similar type and size, not just ones that look good in photographs.
- Interview two or three. Chemistry matters: you will make hundreds of decisions together.
- Ask: Who will actually work on my project? How do you handle a budget that is over target? Which consultants (structural engineer, surveyor, energy consultant) will we need, and who hires them? What do you include in construction-phase services? Can I speak to past clients?
Writing the brief
The brief (also called the program) is your written description of the project. A good one makes every later phase faster. Include:
- Who will use the building, now and in ten or twenty years (children, aging parents, working from home, accessibility needs).
- The spaces you need, with rough sizes and how they relate: which rooms must be near each other, which need quiet, light or privacy.
- How you live: cooking, entertaining, storage, cars, bikes, pets, hobbies.
- Priorities and trade-offs: what matters most if the budget is tight.
- Performance goals: energy efficiency, durability, low maintenance, any certification you want.
- Your total budget, including fees, permits, furniture and a contingency, not just construction.
- Timing: when you need to move in, and any fixed dates.
- Images of buildings and rooms you like, with a note on what you like about each.
The room dimension calculator is handy for putting rough sizes on the rooms you list.
The standard phases
Most US owner-architect agreements, including the standard forms published by the American Institute of Architects (AIA), divide the work into five phases, often preceded by pre-design work such as programming and site analysis:
- Schematic design. The architect explores options and produces rough plans, sketches and sometimes models showing the layout, size and overall form. You choose a direction and approve it before moving on. This is the easiest time to change your mind.
- Design development. The chosen scheme is refined: room sizes, windows, materials, structure and building systems are worked out with consultants such as the structural engineer.
- Construction documents. Detailed drawings and specifications for permitting and building. These become part of the construction contract and are what contractors price.
- Bidding or negotiation. The architect helps you get prices from contractors, compare them on the same basis and choose a builder.
- Construction administration. The architect visits the site to observe the work, answers contractor questions, reviews submittals and payment applications, and helps resolve problems. The extent of this phase is set by the contract, and some owners reduce it to save fees; on most projects it is worth keeping.
Permit applications and any zoning, historic or homeowner association reviews fit in around construction documents. Our guide to building permits explains what the building department reviews.
How fees are usually structured
Fees vary widely with the project, location and scope of services, so get written proposals and compare what each includes. Common structures:
- Percentage of construction cost. The fee rises or falls with the construction cost.
- Fixed (stipulated) fee for a defined scope, often broken down by phase.
- Hourly rates, sometimes with a not-to-exceed cap, common for small projects, feasibility studies and early design.
- Combinations, such as hourly for early design and fixed for later phases.
Also clarify reimbursable expenses (printing, travel, permit fees) and additional services (extra design options, changes after approval, interior design, consultant work), and how they are billed.
What the contract should cover
- the project, site and your brief;
- the scope of services, phase by phase, and what is excluded;
- the construction budget the architect is designing to, and what happens if bids come in over it;
- the fee, payment schedule, reimbursables and rates for additional services;
- which consultants are included and who hires them;
- the schedule and your responsibilities (decisions, survey, information about the site);
- ownership and use of the drawings;
- insurance, termination and dispute resolution.
Standard agreement forms exist (the AIA publishes widely used ones), and many architects use them as a starting point. Read any contract carefully, and have a lawyer review it if the project is large.
Worked example: a first budget check
Before design starts, a rough construction figure helps you see whether the brief and budget match. Example figures only: a two-story house with 1,200 square feet per floor at an example rate of $150 per square foot gives 1,200 x 150 x 2 = $360,000 at a standard finish level in the building cost estimator. Choosing premium finishes (a 1.35 multiplier in the estimator) raises that to $486,000. Adding an example 10 percent contingency to the $360,000 standard figure ($36,000) gives $396,000, before fees, permits and furnishings. Use your own area and get local rates from builders; the estimator gives a rough estimate, not a quote.
During construction
Keep decisions and changes in writing, through the architect, so everyone works from the same drawings. If you visit the site, go only with the contractor's permission and escort, and wear the protective gear they ask for (typically a hard hat, safety boots and eye protection).
This article explains how working with an architect generally works and is not professional or legal advice. Decisions for a specific project are made with a licensed architect or engineer and the local building department, and contracts are best reviewed by a lawyer.